Roof replacement, Buildings 12 and 14 — total small business set-aside
| Item | Where | What it requires | What I do |
|---|---|---|---|
| SF-1442 | p.1 | Solicitation, Offer and Award — blocks 13, 14, 17, 20 | I complete and return it for your signature |
| Amendments | p.1 | Two issued so far; each must be acknowledged in block 14 | I track and acknowledge every one, including any issued after you engage me |
| 52.228-1 | p.14 | Bid guarantee, 20% of bid amount, SF-24 or acceptable security | I flag the amount and the date your surety needs it by |
| Bid schedule | p.22 | 11 line items, unit and extended pricing, no blanks | I lay it out ready for your numbers |
| Wage determination | p.31 | TN20260012 mod 4 — Davis-Bacon, heavy construction | I attach the current version and re-check it on every amendment |
| 52.219-6 | p.38 | Total small business set-aside; 50% self-performance | I flag it so you can confirm your sub split before you commit |
| Reps and certs | p.44 | Must be active in SAM at time of submission | I verify yours are current and won't lapse before award |
| 52.236-27 | p.47 | Site visit, 12 days before close | I put it on your calendar with the registration deadline |
| Specifications | 07 50 00 | Roofing sections reviewed for pre-bid submittals | I read them and tell you if anything is due with the bid |
| Submission | p.52 | Agency portal, PDF, 20MB limit, 2:00 PM local | I hand you a checklist and what still needs your signature |
A package ready for your numbers and your signature: SF-1442 completed, both amendments acknowledged, reps and certs done, the correct wage determination attached, the bid schedule laid out line by line, and a submission checklist with the deadline and upload requirements.
You add the pricing and sign it. That is the part only you can do.