One-load review
Demo Carrier LLC — load 4471,
Memphis, TN → Dallas, TX
picked 2026-09-06 · delivered 2026-09-07 ·
prepared September 15, 2026
3documents received
2not supplied
2worth checking
$180possibly unbilled
Start here. The invoice below is ready to submit as it stands.
The items marked worth checking are amounts that may be billable on top —
each needs one thing confirmed before it goes on.
The invoice I'd have submitted
| Linehaul, per rate confirmation | $2,150.00 |
| Fuel surcharge | $0.00 |
| Total, ready to invoice |
$2,150.00 |
Submitted to the broker in their required format,
with the rate confirmation, BOL and POD attached as one package.
Documents
| Document | Status | Detail |
| Rate confirmation | Received | signed, 2 pages |
| Bill of lading | Received | signed at origin |
| Proof of delivery | Received | signed, timestamped 14:52 |
| Lumper receipt | Not seen | referenced on the POD, not supplied |
| Scale ticket | Not seen | not referenced; may not apply |
Worth checking before you invoice
| Item | Status | Amount | Why |
| Detention at the receiver | Worth checking | $180.00 | POD shows arrival 10:40 and signature 14:52 — 4h12m on site. Most rate confirmations allow 2 hours free, then bill hourly. Worth checking what yours allows. |
| Lumper fee | Worth checking | — | The POD references a lumper. If you paid it, it is normally reimbursable with the receipt attached — which wasn't in what you sent. |
| Linehaul matches the rate confirmation | Confirmed | $2,150.00 | Invoice amount agrees with the rate confirmation. No short-pay risk here. |
| Fuel surcharge | Confirmed | — | Rate confirmation shows an all-in rate, so no separate FSC is due. |
What this review has not seen. This is built only from
the paperwork supplied for one load. Where a document wasn't included it is marked
not seen rather than missing — it may well exist. Nothing here is an assertion
about how you bill generally.
How to read the amounts. A figure marked worth checking
is what the item would be worth if it applies — not money you are definitely owed.
Detention depends on the free time in your rate confirmation, and a lumper is only
reimbursable if you paid it and kept the receipt. You decide what goes on the invoice.
One load. A month of loads produces the same document per load,
plus a short list of what needs a decision from you.